Completed 288 Reynolds bathroom renovation in Oakville by 707 Reno
Completed · July 2026

288 Reynolds · Oakville

A complete rebuild, finished like a retreat.

See how 707 transformed an older family bathroom with full-height large-format tile, warm brass fixtures, custom glass and practical storage—rebuilt from the walls out.

Oakville renovationProfessional trade networkDocumented constructionOne accountable team

The project

A brighter room. A better everyday routine.

The original bathroom had served the home for years. The new room needed to feel current, calm and far more intentional without wasting the footprint.

707 stripped the room back, coordinated the new plumbing and electrical work, rebuilt the wet zone and carried the same finish language through tile, millwork, lighting, hardware and glass.

The result is a clean contemporary bathroom with a warm edge: stone-look walls, a mosaic floor, floating-style vanity, recessed niche and a rain-head-and-wand shower system.

Location288 Reynolds, Oakville
ProjectComplete bathroom renovation
StatusCompleted July 2026
Built by707 Reno Design & Build

Built from behind the walls out

The finished room is only as good as what supports it.

This project was documented through demolition, rough-in work, waterproofing, tile setting and final fit-out so you can see more than the polished reveal.

01

Protect + remove

Protect the route through the home, isolate the work area and remove the original fixtures and finishes to expose the real starting conditions.

02

Resolve + rough in

Coordinate plumbing, electrical, ventilation and framing before anything is closed so the layout works as one complete system.

03

Waterproof + tile

Prepare the wet zone, install the waterproofing system, set the large-format tile and build the recessed feature niche with clean edge details.

04

Fit + finish

Install the vanity, lighting, fixtures, glass, hardware and final details, then complete the walkthrough and finish list with the homeowner.

Watch the build

The construction story, not only the after photo.

The full walkthrough explains the transformation. The short updates document specific stages from demolition through the finished room. Videos load only when you choose one.

Project updates

Tap any clip to watch

Planning your own bathroom

A beautiful complete bathroom starts at $18,000.

Labour and materials are included in the starting price—not separated into a low headline followed by obvious necessities.

Room size, layout changes, fixture selections, tile, glass and finish level determine the final investment. We confirm the actual scope and selections before construction begins.

Complete bathroom renovationFrom $18K

A practical starting point for a fully rebuilt, design-conscious family bathroom.

  • Demolition, disposal and site protection
  • Plumbing, electrical, drywall and paint
  • Large-format tiled shower or tub surround
  • Glass shower or tub enclosure
  • Rain head and hand-shower system
  • Vanity, lighting, hardware and finish installation
707 Designer · +$7,700

Our elevated design and finish package includes a 3-year workmanship warranty. Final upgrade scope is confirmed for the individual bathroom.

Planning guidance only—not the contract price of the 288 Reynolds project or a quote for your home.

Plan a similar bathroom

Tell us what is no longer working.

Share your location, the bathroom you want to renovate, approximate timing and a few photos if you have them. Daniel will review it personally and follow up about the most sensible next step.

Bathroom questions

What to know before demolition.

Talk through my bathroom
What is included in the $18,000 starting price?

The starting point includes labour and materials for a complete tiled bathroom with a glass shower or tub enclosure, rain head and hand-shower system, vanity, plumbing, electrical, drywall, paint, lighting and finish installation. Size, layout, tile, glass, fixtures and selections affect the final price.

How long does a complete bathroom take?

Many complete bathroom renovations require approximately 10–20 working days once construction begins. Custom glass, specialty materials, inspections, discoveries behind the walls and scope complexity can affect the schedule.

What is the 707 Designer package?

707 Designer is an elevated design and finish package priced at $7,700 above the applicable base scope. It includes a 3-year workmanship warranty. The exact package inclusions are confirmed for your room before you proceed.

When is the project price confirmed?

We assess the room, define the scope and confirm the selections that affect cost before construction. If a hidden condition or requested change affects price, it is discussed and approved before the additional work proceeds.

How do you control dust and disruption?

Site protection, work-area isolation and the access route are planned before demolition. We keep the site organized, communicate upcoming work and coordinate the professional trade network through one accountable project lead.